- You have an average annual wind speed of at least 3 m/s at your site
- The utility's requirements for connecting your system to its grid are not prohibitively expensive
|
- You have an average annual wind speed of at least 3 m/s at your site
- A grid connection is not available or can only be made through an expensive extension. The cost of running a power line to a remote site to connect with the utility grid can be prohibitive (up to $30,000 per kilometer), depending on terrain.
- You would like to gain energy independence from the grid
|